top of page
Untitled design - 2020-12-10T150353.171.

Power Meter

Digitalization

Before

Implementation

System

Configuration

  • Operator needed to go to every power meter to reading the readings everyday

  • Time consuming process

  • Unable to spot human error

  • Ewon Flexy201 with Serial Comm Module for Modbus RTU connection to Power Meter

  • 4G Module is used as site environment does not permit LAN cable and wireless connection to office 

Benefits of the Implementation

01

Digitalization saves time and reduces human error

02

Log data in CSV format can be easily accessed anytime and everywhere as long as there is internet connection

03

Real time reading monitoring

04

SMS Alarm notification

bottom of page